Paint is the last step of a good job and the first thing to fail on a rushed one. Most of a paint job is preparation: washing, scraping, sanding, filling, caulking and priming. The color goes on at the end.
Brian Farrell paints rooms, trim, doors, porches and exterior sections, and stains decks and fences. Because he also does the carpentry and drywall, the rotted board or cracked wall gets fixed first instead of painted over.
What this covers
Rooms, ceilings and hallways
Walls patched and sanded, edges cut clean, two finish coats. Furniture and floors are covered, and the room goes back together at the end.
Trim, doors and cabinets
Baseboard, casing, doors and built-ins sanded and painted in a durable enamel. Old oil paint gets a bonding primer first so the new coat holds.
Exterior touch-up and sections
One weathered side of the house, the trim, a porch, a garage, a set of shutters. Loose paint is scraped to a sound edge, bare wood is primed and joints are caulked.
Porches, railings and steps
Porch floors, ceilings, columns and railings, which take more wear and weather than the rest of the house.
Deck and fence staining
Cleaning, light sanding where needed, and a penetrating stain on a dry deck. Peeling film finishes are stripped or sanded before recoating.
Paint after repairs
Priming and painting new trim, patched drywall and replaced clapboards so a repair is finished in one job.
The Vermont painting season
Exterior paint needs dry wood and mild temperatures to cure. In the Champlain Valley that window runs from about mid-May into October, and cool nights and morning dew shorten the working day at both ends of it. Most exterior paints want the surface above 50 degrees, and some are rated to 35. Brian plans exterior work for that window and books interior work through the winter.
South and west walls take the most sun and fail first. Paint near the ground takes splash-back and snow. A full repaint is not always needed. Often one or two sides of the house, plus the trim, are due while the rest has years left.
Vermont presumes lead in the paint of any house built before 1978. Since October 2022 the Vermont Department of Health has run the state's own lead-safe work rules, known as RRPM, for anyone paid to disturb that paint. Ask any painter you hire, this one included, how they plan to handle it.
Good to know before you call
- Pick the color and sheen before the start date. Brian can bring sample cards or work from a color you already have.
- Stain goes on a dry deck. After rain or washing, the boards need a couple of dry days first.
- Flat hides wall flaws, eggshell wipes clean, satin or semi-gloss suits trim and doors.
- Winter is the easiest time to book interior painting.
Interior & Exterior Painting by town
Charlotte
Exterior touch-up on the wind and weather sides of exposed houses.
Burlington
Interior repaints and porch painting, with Vermont's lead paint rules for pre-1978 homes settled before work starts.
Williston
Room repaints and exterior trim painting.
Vergennes
Porch and trim painting, with Vermont's lead paint rules for pre-1978 homes settled before work starts.
Questions about interior & exterior painting
When can exterior painting be done in Vermont?
From about mid-May into October, on dry days when the surface is warm enough for the paint to cure. Spring and fall days start late because dew has to burn off first. Interior painting runs all year.
Do you paint a whole house exterior?
Brian takes on sections and smaller exteriors: a weathered side, the trim, a porch, a garage or a small house. For a large full repaint that needs a crew and staging, he will say so and point you to a painting company.
My house was built before 1978. What about lead paint?
Vermont law presumes lead in the paint of a pre-1978 house unless a licensed lead inspector has cleared it. The state's RRPM rules, run by the Department of Health, set how that paint may be disturbed and cleaned up. Tell Brian the age of the house so the estimate covers the right method.